Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 LS PS 4 & PS 5 building demolition, 1 LS PS 4 & PS 5 wood frame building construction, 1 LS PS 4 & PS 5 electrical system, 1 LS PS 6 electrical system, 170 TN crushed surfacing base course (1.25" minus), 195 SF reinforced cement concrete pad, 180 SF 4" cement concrete pad, 3 EA installation of power backup generator (owner furnished), 155 LF 6' tall fence and gate, 1 LS PS 4 & PS 5 pump installation (owner furnished) and mechanical piping. Alternate: 1 LS 6" ultrasonic meter installation and connection to existing pipe, 1 LS trench safety system (shoring).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableReplacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableThis RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
This RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
Water well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Water well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis