Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Tioga
Work including a 150 kW natural gas generator, generator pad, associated electrical improvements, and natural gas service line.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of High Point
The City of High Point seeks proposals for the addition of a generator at the Oak Hollow Pump Station. The project includes site work, construction of concrete pads, installation of a 1250 kW generator, transformers, and automatic transfer switches, and connection to existing services. Coordination with the Owner's Integrator for SCADA system modifications is required.
Posted Date
-
Due Date
Dec 17, 2025
City of High Point
Close: Dec 17, 2025
The City of High Point seeks proposals for the addition of a generator at the Oak Hollow Pump Station. The project includes site work, construction of concrete pads, installation of a 1250 kW generator, transformers, and automatic transfer switches, and connection to existing services. Coordination with the Owner's Integrator for SCADA system modifications is required.
AvailableCity of Lincoln
LWS N 56th Street pump station engine generator project.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
City of Lincoln
Close: Dec 12, 2025
LWS N 56th Street pump station engine generator project.
AvailableCity of Raleigh
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Posted Date
Oct 17, 2025
Due Date
Dec 4, 2025
Release: Oct 17, 2025
City of Raleigh
Close: Dec 4, 2025
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
AvailableCity of Woodstock
Replacing and installing four (4) fixed generators at critical facilities in the community and upgrading the generator at the City Annex. This includes but is not limited to upgrading the 30 kW generator at the City Annex to a 175-kW fixed to include an automatic transfer switch and concrete pad, replacing two (2) pump stations at Brookshire (50 kW, 100 kW), and two (2) pump stations at Bell Park (75kW).
Posted Date
Sep 18, 2025
Due Date
Dec 3, 2025
Release: Sep 18, 2025
City of Woodstock
Close: Dec 3, 2025
Replacing and installing four (4) fixed generators at critical facilities in the community and upgrading the generator at the City Annex. This includes but is not limited to upgrading the 30 kW generator at the City Annex to a 175-kW fixed to include an automatic transfer switch and concrete pad, replacing two (2) pump stations at Brookshire (50 kW, 100 kW), and two (2) pump stations at Bell Park (75kW).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis