Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes all necessary labor, equipment, and material to install 1 – 16"x12" wet tap and valve, 1 - 16" insertion valve, 1 - 16" pipe cap, approx. forty (40)± of flowable fill for pipe section to be abandoned in-place, 1 emergency pump connection, 96 SF of 6" concrete flatwork, bypass pumping, wet well lining and restoration, and site restoration. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Sealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
Premium
Access the largest public sector contact database
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Jun 18, 2025
Due Date
Jan 15, 2026
Release: Jun 18, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableLump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.