Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WSU seeks a planning/programming firm to provide predesign/predesign programming services for a new or renovated dairy facility in Pullman, delivering program documentation, site feasibility and utility/infrastructure analyses, equipment needs, maintenance/operations financials, conceptual construction cost estimate, zero‑carbon technology evaluation, fundraising/options menu, and 3–4 fundraising/rendering images. SOQ must be submitted as a PDF (8 single‑sided page limit); firm must be licensed in Washington.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design, provision, and installation of a modernization of the existing elevator at high school.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Design, provision, and installation of a modernization of the existing elevator at high school.
AvailableWork includes the design, provision, and installation of a modernization of the existing elevator. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes the design, provision, and installation of a modernization of the existing elevator. See attached file.
AvailableWork includes the design, provision, and installation of a modernization of the existing elevator. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes the design, provision, and installation of a modernization of the existing elevator. See attached file.
AvailableDESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis