Summary
Work includes 1 LS of mobilization; 1 LS of clearing and grubbing; 1 LS of landscaping restoration; 1,618 LF of asphalt saw cut; 5,000 SF of remove asphalt; 320 SF of remove concrete; 425 CY of unclassified excavation (plan quantity) ; 1,450 LF of curb and gutter, type m1; 5,941 sf of concrete flatwork, 4" thick; 1,410 SF of concrete drive approach, 6" thick; 5 EA of ada curb ramp; 500 SF of stamped colored reinforced concrete crossing (8" thick); 2,423 SF of colored concrete flatwork, 4" thick (park strip); 450 LF of 12" storm drain pipe; 3 EA of curb inlet box 18"x48"x48"; 1 EA of 48"x48"x48" storm drain junction box; etc, see attached file.