Summary
Provide complete construction services including labor, materials, equipment, and supervision required to complete the correct imaging tower deficiencies project. project is intended to replace the full roof above A2013 & A2016, along with lead-lined door replacement in A2016 (in favor of something like a traditional double-door where both sides open with operator). Additionally, this project will add cooling capacity to CT control room A2016A through the placement of a dedicated ductless split system with capacity to cool at a rate of up to 30k BTU/HR. The installation of this should be all inclusive of all carpentry, power and plumbing work.