Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of work includes, but is not limited to: site survey and assessment of existing conditions, hydrological and geotechnical investigations, preparation of stamped, bid-ready construction plans with cost estimates, details, and specifications, applicable permits, and environmental assessments.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Dec 31, 2025
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
AvailableSeeking chemical injection soil stabilization services at middle school. The building area and a 5-ft perimeter outside the building shall be stabilized to a depth of 15-ft by pressure injection using a chemical grout designed to reduce the swell potential of the on-site expansive clays. The area to be injected is approx. 20,145 SF.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Close: Jan 5, 2026
Seeking chemical injection soil stabilization services at middle school. The building area and a 5-ft perimeter outside the building shall be stabilized to a depth of 15-ft by pressure injection using a chemical grout designed to reduce the swell potential of the on-site expansive clays. The area to be injected is approx. 20,145 SF.
AvailableProvide professional hearing examiner services, including but not limited to: conducting administrative hearings and/or mediations for petitions and appeals filed under the city's rent stabilization and just cause for eviction ordinance rent stabilization and good cause for eviction ordinance; reviewing petition/appeal information and data for accuracy and responding to staff's inquiries concerning particular petitions/appeals; researching and analyzing federal and state legislation and applicable case law affecting pending petitions/appeals; preparing settlement agreements; responding to written inquiries related to hearing decisions on assigned cases. See outside link.
Posted Date
Jul 28, 2025
Due Date
Dec 31, 2025
Release: Jul 28, 2025
Close: Dec 31, 2025
Provide professional hearing examiner services, including but not limited to: conducting administrative hearings and/or mediations for petitions and appeals filed under the city's rent stabilization and just cause for eviction ordinance rent stabilization and good cause for eviction ordinance; reviewing petition/appeal information and data for accuracy and responding to staff's inquiries concerning particular petitions/appeals; researching and analyzing federal and state legislation and applicable case law affecting pending petitions/appeals; preparing settlement agreements; responding to written inquiries related to hearing decisions on assigned cases. See outside link.
AvailableThe project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis