Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Primer Coating, National Stock Number 8010015652614, Part Number 23354 DOVRSATHNNTA/B688.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide paint primer, blast media and paint thinner materials.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Close: Feb 6, 2026
Provide paint primer, blast media and paint thinner materials.
AvailablePaint-sherwin williams, white pigmented shellac primer. 1 gallon.
Posted Date
Jan 29, 2026
Due Date
Feb 2, 2026
Release: Jan 29, 2026
Close: Feb 2, 2026
Paint-sherwin williams, white pigmented shellac primer. 1 gallon.
AvailablePrimer, Black, LRV, S. W. Krylon Spar-Var, BBP 398, Aerosol Spray.
Posted Date
Jan 27, 2026
Due Date
Feb 5, 2026
Release: Jan 27, 2026
Close: Feb 5, 2026
Primer, Black, LRV, S. W. Krylon Spar-Var, BBP 398, Aerosol Spray.
AvailableWork generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Work generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →