Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fabrication and delivery of a prefabricated weathering steel truss bridge, approximately 148 feet long by 14 feet wide.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction and delivering a prefabricated weathering steel truss bridge approx 148' long by 14' wide per project.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes construction and delivering a prefabricated weathering steel truss bridge approx 148' long by 14' wide per project.
AvailableDesign, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Design, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
AvailableWork consists of removal and replacement of an existing bridge structure, earthwork, and road base. The contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge.
Posted Date
Aug 20, 2025
Due Date
Jan 15, 2026
Release: Aug 20, 2025
Close: Jan 15, 2026
Work consists of removal and replacement of an existing bridge structure, earthwork, and road base. The contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge.
AvailableRenovate Multi Purpose Room
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Renovate Multi Purpose Room
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →