Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes of 1 prefabricated single-span utility bridge, concrete foundations, piping anchorages and supports, casing pipe as specified, testing as specified; See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge: 39A014 concrete slab on fabricated steel girder span(s): 4 structure steel.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Bridge: 39A014 concrete slab on fabricated steel girder span(s): 4 structure steel.
AvailablePremium
Access the largest public sector contact database
Furnish and deliver a pre-engineered pre-fabricated building to serve as a customer service unit.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Furnish and deliver a pre-engineered pre-fabricated building to serve as a customer service unit.
AvailableFurnish and installation of a pre-fabricated shelter.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Close: Dec 16, 2025
Furnish and installation of a pre-fabricated shelter.
AvailableProvide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis