Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Soliciting bids from licensed and qualified Underground Utility Contractors for the installation and repair of potable water main pipes, including associated appurtenances, drainage improvements, and site restoration within the City of West Miami.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableProvide engineering services for water treatment plant phase iii pfas improvements.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Provide engineering services for water treatment plant phase iii pfas improvements.
AvailableWork consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Posted Date
Nov 12, 2024
Due Date
Jan 8, 2026
Release: Nov 12, 2024
Close: Jan 8, 2026
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
AvailableSealed construction bids for municipal water system improvements: install ~140 linear feet of 4" PVC, ~74 linear feet of 6" PVC, ~2,779 linear feet of 12" PVC, gate valves, ~6 fire hydrants, ~10 tapping sleeves, ~25 service transfers and related appurtenances. Single-prime lump-sum/unit-price contract; 100% performance and payment bonds required; Buy America (BABAA) and CDBG/HUD Section 3 requirements apply; bidders must obtain complete bidding documents from the issuing engineer.
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
Sealed construction bids for municipal water system improvements: install ~140 linear feet of 4" PVC, ~74 linear feet of 6" PVC, ~2,779 linear feet of 12" PVC, gate valves, ~6 fire hydrants, ~10 tapping sleeves, ~25 service transfers and related appurtenances. Single-prime lump-sum/unit-price contract; 100% performance and payment bonds required; Buy America (BABAA) and CDBG/HUD Section 3 requirements apply; bidders must obtain complete bidding documents from the issuing engineer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis