Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To provide both basic and advanced applications using the Allen-Bradley L16ER 5370 PLC and the Studio 5000 Mini (for Education) PLC Programming Software.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Building 16 Generator PLC Upgrade. Work shall consist of but is not limited to the following: Inspect, troubleshoot, and repair or replace generator PLC controls. PLC is a Telmecanique/Advantys STBNMP2212 PLC Island and connected output modules controlling a Kohler 1.5 MW Diesel Generator set. Contractor is to troubleshoot and repair PLC to original installation parameters. Verify restored PLC/Generator set operations and communication. Ensure repairs with a function check of generator operations in standalone and parallel modes. There will be an option to install a Hot Switch Bypass.
Posted Date
Jan 10, 2026
Due Date
Jan 28, 2026
Release: Jan 10, 2026
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Building 16 Generator PLC Upgrade. Work shall consist of but is not limited to the following: Inspect, troubleshoot, and repair or replace generator PLC controls. PLC is a Telmecanique/Advantys STBNMP2212 PLC Island and connected output modules controlling a Kohler 1.5 MW Diesel Generator set. Contractor is to troubleshoot and repair PLC to original installation parameters. Verify restored PLC/Generator set operations and communication. Ensure repairs with a function check of generator operations in standalone and parallel modes. There will be an option to install a Hot Switch Bypass.
Requirement for siemens plc hardware and software.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
Requirement for siemens plc hardware and software.
AvailableProvide certified athletic trainer services.
Posted Date
Dec 26, 2025
Due Date
Feb 13, 2026
Release: Dec 26, 2025
Close: Feb 13, 2026
Provide certified athletic trainer services.
AvailableAthletic Trainer/Fieldhouse Equipment and Supplies.
Posted Date
Nov 26, 2025
Due Date
Feb 3, 2026
Release: Nov 26, 2025
Close: Feb 3, 2026
Athletic Trainer/Fieldhouse Equipment and Supplies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →