Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To provide 13 TON hopper with SS load cells, SS conditioner, SS metering chain, impregnator system, transition auger, cleated loadout system, control panel, control cable, installation and commissioning.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Multimodal Pathway Overlay Project. Patching, asphalt paving fabric placement and paving.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Multimodal Pathway Overlay Project. Patching, asphalt paving fabric placement and paving.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To conduct and deliver the multimodal regional thoroughfare study update.
Posted Date
Jan 4, 2026
Due Date
Feb 6, 2026
Release: Jan 4, 2026
Close: Feb 6, 2026
To conduct and deliver the multimodal regional thoroughfare study update.
AvailableConstructing a new truck weigh station along the side of the northbound lane.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Constructing a new truck weigh station along the side of the northbound lane.
AvailableWork includes 1 LS excavation & embankment; 13,222 SY in-place cement treated base course (12" thick); 29,500 SY portland cement concrete pavement (14" thick); 66 LF storm drain pipe (24" rcp); 2 EA adjusting catch basins; 1,350 SY concrete cast-in-place revetment (6" thick); 100 LF tamping and leveling existing track; 1,100 LF saw cutting (full depth); 1 LS railroad drainage - including 12" non-perforated storm drain pipe, connecting to existing track french drain system, & tie-in to existing catch basin; 1 LS potable water distribution systems - including removal of existing valves, bollards, hydrants, etc and furnishing and installing new valves, bollards, hydrants, etc.
Posted Date
Jan 16, 2026
Due Date
Feb 27, 2026
Release: Jan 16, 2026
Close: Feb 27, 2026
Work includes 1 LS excavation & embankment; 13,222 SY in-place cement treated base course (12" thick); 29,500 SY portland cement concrete pavement (14" thick); 66 LF storm drain pipe (24" rcp); 2 EA adjusting catch basins; 1,350 SY concrete cast-in-place revetment (6" thick); 100 LF tamping and leveling existing track; 1,100 LF saw cutting (full depth); 1 LS railroad drainage - including 12" non-perforated storm drain pipe, connecting to existing track french drain system, & tie-in to existing catch basin; 1 LS potable water distribution systems - including removal of existing valves, bollards, hydrants, etc and furnishing and installing new valves, bollards, hydrants, etc.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →