Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Chester seeks bids to replace water heaters at the Pocopson Home, including all necessary labor, materials, and equipment and requiring bid, performance, and labor & materials bonds. Solicitation documents and submission instructions are hosted on the buyer's PublicPurchase posting and require access via the PublicPurchase interface.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The County of Chester seeks bids to replace water heaters at the Pocopson Home, including all necessary labor, materials, and equipment and requiring bid, performance, and labor & materials bonds. Solicitation documents and submission instructions are hosted on the buyer's PublicPurchase posting and require access via the PublicPurchase interface.
Posted Date
Nov 17, 2025
Due Date
Jan 7, 2026
Release: Nov 17, 2025
Close: Jan 7, 2026
The County of Chester seeks bids to replace water heaters at the Pocopson Home, including all necessary labor, materials, and equipment and requiring bid, performance, and labor & materials bonds. Solicitation documents and submission instructions are hosted on the buyer's PublicPurchase posting and require access via the PublicPurchase interface.
Premium
Access the largest public sector contact database
Work consists of: upgrading existing process water loop serving approximately 43 water cooled plant growth chamber condensing units and heat pump units. Anticipated trades needed for this project include pipe fitters, insulation installers, control technicians, and electricians.
Posted Date
Aug 19, 2025
Due Date
Jan 27, 2026
Release: Aug 19, 2025
Close: Jan 27, 2026
Work consists of: upgrading existing process water loop serving approximately 43 water cooled plant growth chamber condensing units and heat pump units. Anticipated trades needed for this project include pipe fitters, insulation installers, control technicians, and electricians.
AvailableInstall 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
AvailableWork includes chiller replacement.
Posted Date
Oct 20, 2025
Due Date
Dec 30, 2025
Release: Oct 20, 2025
Close: Dec 30, 2025
Work includes chiller replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis