Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1 LS general construction work; 1 LS electrical work. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
Posted Date
Dec 18, 2025
Due Date
Feb 5, 2026
Release: Dec 18, 2025
Close: Feb 5, 2026
The Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
AvailableThe scope of work includes the renovation of the existing Thorn Run Fire Station including select demolition and legal off-site disposal of materials; construction of interior renovations including interior walls and wall finishes, acoustical tile ceiling, interior doors, windows, interior signage; elevator; site stormwater and all necessary appurtenances.
Posted Date
Dec 16, 2025
Due Date
Feb 6, 2026
Release: Dec 16, 2025
Close: Feb 6, 2026
The scope of work includes the renovation of the existing Thorn Run Fire Station including select demolition and legal off-site disposal of materials; construction of interior renovations including interior walls and wall finishes, acoustical tile ceiling, interior doors, windows, interior signage; elevator; site stormwater and all necessary appurtenances.
AvailableThe scope of work generally includes electrical construction associated with the interior renovations to the existing Thorn Run Fire Station. Work includes wiring facility, interior lighting, emergency lighting, light switches, touchscreen switches and power packs, receptacles, data outlets, fire alarms, touchscreen switch and power pack for new entry lighting and connections to HVAC equipment; and all necessary appurtenances.
Posted Date
Dec 16, 2025
Due Date
Feb 6, 2026
Release: Dec 16, 2025
Close: Feb 6, 2026
The scope of work generally includes electrical construction associated with the interior renovations to the existing Thorn Run Fire Station. Work includes wiring facility, interior lighting, emergency lighting, light switches, touchscreen switches and power packs, receptacles, data outlets, fire alarms, touchscreen switch and power pack for new entry lighting and connections to HVAC equipment; and all necessary appurtenances.
AvailableThe solicitation titled 'Contract No. 2 - Stormwater Pump Station' requests proposals for construction/services related to a stormwater pump station in Michigan. The posting was published 2026-01-06 with a closing date of 2026-02-11 at 14:00 EST (2026-02-11T19:00:00Z); bid documents and issuer contact information are available on the buyer's BidNet page but require registration to view. This is a procurement RFP (not a grant) and appears to be a single, project-specific solicitation.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
The solicitation titled 'Contract No. 2 - Stormwater Pump Station' requests proposals for construction/services related to a stormwater pump station in Michigan. The posting was published 2026-01-06 with a closing date of 2026-02-11 at 14:00 EST (2026-02-11T19:00:00Z); bid documents and issuer contact information are available on the buyer's BidNet page but require registration to view. This is a procurement RFP (not a grant) and appears to be a single, project-specific solicitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →