Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hillsdale Community Schools seeks bids for the purchase, delivery, and installation of playground equipment including a Trailblazer structure (or equivalent), swing systems with ADA-accessible swing, engineered wood fiber surfacing, borders, and site preparation. The contractor must provide all labor, materials, delivery, installation, and comply with ASTM and CPSC safety standards and manufacturer specifications. The solicitation is a Request for Proposals issued by the school district with an estimated value range and a response deadline in January 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Playground Equipment and Installation.
Posted Date
Nov 23, 2025
Due Date
Jan 29, 2026
Release: Nov 23, 2025
Close: Jan 29, 2026
Playground Equipment and Installation.
AvailableCity of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
City of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
Work includes playground installation work.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Work includes playground installation work.
AvailableRelease: Dec 10, 2025
Close: Jan 14, 2026
Playground Equipment Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis