Summary
Install approx 26,000 LF of 60" I.D. HDPE Profile-Wall pipe or 63" O.D. Solid-Wall HDPE pipe and approx 820 LF of 48" O.D. Solid-Wall HDPE pipe; install all bends, tees, end connections; remove existing temporary concrete intake structure; furnish and install a reinforced concrete inlet structure and two relocated traveling screens; mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, and surface restoration; remove two county bridges, and other bridges and culverts; coordinate utility locations and relocations; coordinate with owner and owner's engineer; furnish and install all other associated meter assemblies, stub turnouts, cleanouts with air and vacuum valve assemblies, valves and valve cans, and cleanout assemblies.