Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project would improve the parking area that provides access. This project also includes installation of a shuttle stop-maintained landscape (sidewalk, staging area, and shade structure with benches), relocation of the existing trailhead kiosk/wayside exhibit, and extension of 1,000 linear feet of water line. The parking area currently serves as a disorganized shuttle stop where visitors are unsure where to wait. This project will create a designated and accessible space, improving the park-run alternative transportation system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The National Park Service (NPS) issued a Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA. Work includes regrading and paving the parking surface to meet ABAAS, removal of deteriorated surfacing, drainage improvements, restriping, installation of an accessible prefabricated vault toilet with holding tank, extension of water line and pump, and creation of designated shuttle stop areas with shade structures and benches. The anticipated period of performance is 365 calendar days and the notice is intended to gather information to inform acquisition strategy (NAICS 237310).
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The National Park Service (NPS) issued a Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA. Work includes regrading and paving the parking surface to meet ABAAS, removal of deteriorated surfacing, drainage improvements, restriping, installation of an accessible prefabricated vault toilet with holding tank, extension of water line and pump, and creation of designated shuttle stop areas with shade structures and benches. The anticipated period of performance is 365 calendar days and the notice is intended to gather information to inform acquisition strategy (NAICS 237310).
AvailableThe National Park Service (Department of the Interior) is conducting a market research Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA, including paving (approx. 10,500 sq ft), accessible facilities (prefabricated vault toilet), pedestrian walkways, water-line extension, and a shuttle stop with shade structure. This Sources Sought requests completed Sources Sought Survey Questionnaires and represents the market research phase; a single Firm-Fixed-Price contract through a competitive RFP is anticipated later (formal RFP to follow). Interested parties must submit a completed Sources Sought Survey Questionnaire by January 15, 2026 at 2:00 PM Mountain Time (2026-01-15T21:00:00Z), and the opportunity is not a grant.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Provide parking & transportation shuttle operations services.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Provide parking & transportation shuttle operations services.
AvailableProvide a complete rehab of our rooftop parking deck.
Posted Date
Dec 8, 2025
Due Date
Dec 29, 2025
Release: Dec 8, 2025
Close: Dec 29, 2025
Provide a complete rehab of our rooftop parking deck.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The National Park Service (Department of the Interior) is conducting a market research Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA, including paving (approx. 10,500 sq ft), accessible facilities (prefabricated vault toilet), pedestrian walkways, water-line extension, and a shuttle stop with shade structure. This Sources Sought requests completed Sources Sought Survey Questionnaires and represents the market research phase; a single Firm-Fixed-Price contract through a competitive RFP is anticipated later (formal RFP to follow). Interested parties must submit a completed Sources Sought Survey Questionnaire by January 15, 2026 at 2:00 PM Mountain Time (2026-01-15T21:00:00Z), and the opportunity is not a grant.