Work includes to remove and improve spillway for pines east lake dam. Remove and replace top 4-5 timbers of existing timber wall along dam face for approx. 330 LF, with a concrete apron behind time wall. 1 LS color audio/video recording, pre & post construction (recorded digitally on dvd); 1 LS sediment and erosion control; 1 LS unclassified excavation; 1 LS clearing and grubbing; 1 LS construction staking (construction survey); 1 LS GPS "as-built" survey; 1 LS construction signing and traffic control; 1 LS mobilization; 275 LF remove & replace 5' wide 4" P.C. Concrete sidewalk; 119 CY riprap w/ filter blanket; 90 LF remove & replace fence (wrought iron fence); 750 SY solid slab sodding; 199 LF trapezoidal concrete spillway; 330 LF reinforced concrete wall (1'x4'); 2,310 SF remove & replace timber wall. See attached file.