Summary
Project consists of the replacement of bridge. The new bridge will replace the existing 12' diameter corrugated metal culvert. The new 116' span x 24' usable width single-span bridge will be constructed of precast prestressed concrete bulb tee beams on a driven pile foundation. Improvements consist of, but are not limited to: removal of existing culvert, riprap, supply and installation of precast concrete bulb tee beams, supply and installation of steel h piles, cast-in-place concrete pile caps and wingwalls, guardrail, bridge rail, structural backfill, roadway embankment, aggregate surfacing, signing, and other miscellaneous items.