Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Syracuse
The work will be bid as a single contract and includes, in general, the interior restoration and rehabilitation of the historic property and construction of a three-story addition for accessibility. The work will involve, in general, limited interior removals, framing repairs, specialty carpentry repair and restoration, new concrete, masonry, new toilet and bathrooms, floor and wood trim restoration, plaster restoration, new drywall, installation of a new LULA elevator, and new mechanical, electrical, plumbing, and sprinkler systems.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Omaha
Ecosystem restoration, element 1 phase 2
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
U.S. Army Engineer District Omaha
Close: Dec 17, 2025
Ecosystem restoration, element 1 phase 2
AvailableTown of East Hampton
Work includes house restoration.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Town of East Hampton
Close: Dec 11, 2025
Work includes house restoration.
AvailableCity of Lynn
Scope of work includes but is not limited to, the interior renovation and conversion of the 2nd and 4th floor of an existing building to accommodate the needs of public schools. The project includes selective demolition, mepf system upgrades, interior finishes including the construction of new partition walls, painting, resilient flooring, and acoustic ceiling tiles.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
City of Lynn
Close: Dec 3, 2025
Scope of work includes but is not limited to, the interior renovation and conversion of the 2nd and 4th floor of an existing building to accommodate the needs of public schools. The project includes selective demolition, mepf system upgrades, interior finishes including the construction of new partition walls, painting, resilient flooring, and acoustic ceiling tiles.
AvailableCity of Charlotte
Project consists of a single-story addition to concourse E just south of aircraft envelope E4 and adjacent to the employee turnstile. The addition is primarily a shell space to be leased to a tenant or stakeholder for the final buildout. The base bid is for a 4,350 SF addition and associated site work with add alternates to increase the total SF, include interior finishes, and add interior walls. Scopes of work that are included in this project but not limited to are: selective demolition, concrete SOG, structural steel, metal decking, miscellaneous steel fabrications, rough carpentry, PVC roofing and sheet metal, insulated core metal wall panels, waterproofing, joint sealants, hollow metal (HM) doors and frames, door hardware, glazing, non-structural framing, gypsum board, acoustical panel ceilings, sheet carpeting, resilient base and accessories, painting, pre-engineered interior wall panel systems, resinous terrazzo flooring, signage, wall protective coverings, corner guards, fire protection specialties, plumbing, HVAC, electrical, fire sprinkler, telecommunications, and pavement markings. See attached file.
Posted Date
-
Due Date
Dec 10, 2025
Release: -
City of Charlotte
Close: Dec 10, 2025
Project consists of a single-story addition to concourse E just south of aircraft envelope E4 and adjacent to the employee turnstile. The addition is primarily a shell space to be leased to a tenant or stakeholder for the final buildout. The base bid is for a 4,350 SF addition and associated site work with add alternates to increase the total SF, include interior finishes, and add interior walls. Scopes of work that are included in this project but not limited to are: selective demolition, concrete SOG, structural steel, metal decking, miscellaneous steel fabrications, rough carpentry, PVC roofing and sheet metal, insulated core metal wall panels, waterproofing, joint sealants, hollow metal (HM) doors and frames, door hardware, glazing, non-structural framing, gypsum board, acoustical panel ceilings, sheet carpeting, resilient base and accessories, painting, pre-engineered interior wall panel systems, resinous terrazzo flooring, signage, wall protective coverings, corner guards, fire protection specialties, plumbing, HVAC, electrical, fire sprinkler, telecommunications, and pavement markings. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis