Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableConstruction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
AvailableWork includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Work includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis