Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of permanent modular buildings. The initial contract period shall be from July 1, 2025 to August 31, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of (3) 24' x 40' modular classroom buildings elementary school.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Construction of (3) 24' x 40' modular classroom buildings elementary school.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of animal services modular shelter installation project. The project includes the installation of two (2) 20' x 60' pre-manufactured modular kennel buildings, each designed to house twelve dog runs and twelve dog boxes, increasing the shelter's intake capacity and improving animal welfare conditions.
Posted Date
Jan 6, 2026
Due Date
Feb 9, 2026
Release: Jan 6, 2026
Close: Feb 9, 2026
Work consists of animal services modular shelter installation project. The project includes the installation of two (2) 20' x 60' pre-manufactured modular kennel buildings, each designed to house twelve dog runs and twelve dog boxes, increasing the shelter's intake capacity and improving animal welfare conditions.
AvailableJames Madison University issued RFP# DKM-1246 seeking vendors to provide modular building systems and shipping container solutions including design modifications, transportation, installation, tenant improvements, and related services. The contract performance period begins at award for one year with up to four one-year renewals. Proposals are required to demonstrate appropriate Virginia contractor licensing, bonding capability, and project management staffing.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
James Madison University issued RFP# DKM-1246 seeking vendors to provide modular building systems and shipping container solutions including design modifications, transportation, installation, tenant improvements, and related services. The contract performance period begins at award for one year with up to four one-year renewals. Proposals are required to demonstrate appropriate Virginia contractor licensing, bonding capability, and project management staffing.
AvailableConstruction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
Posted Date
Jan 10, 2026
Due Date
Feb 2, 2026
Release: Jan 10, 2026
Close: Feb 2, 2026
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →