Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing and installing approx. 50 LF of buried 3" waterline, including valves, flow meters, and other appurtenances. Furnishing and installing interior 3" water lines, valves, back flow prevention, pipe supports, accessories, insulation and heat tracing, and a 3" sanitary drain line in the existing Peery Hall mechanical room at VSDB campus. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Virginia School for the Deaf and the Blind (VSDB) is soliciting bids for the Peery Water Line Replacement project at the VSDB campus in Staunton, VA, which includes furnishing and installing approximately 50 linear feet of buried 3” waterline plus interior 3” water lines, valves, flow meters, backflow prevention, supports, insulation/heat tracing, and a 3” sanitary drain in Peery Hall mechanical room. The procurement is an Invitation for Bid (IFB-109746) for construction work with an estimated budget range noted by the aggregator; bidders are instructed to access the buyer-managed posting for full documents and submission instructions. The opportunity was posted starting 2025-12-18 and closes on 2026-01-28 (thus it is open as of 2025-12-20) and is not a grant program.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
The Virginia School for the Deaf and the Blind (VSDB) is soliciting bids for the Peery Water Line Replacement project at the VSDB campus in Staunton, VA, which includes furnishing and installing approximately 50 linear feet of buried 3” waterline plus interior 3” water lines, valves, flow meters, backflow prevention, supports, insulation/heat tracing, and a 3” sanitary drain in Peery Hall mechanical room. The procurement is an Invitation for Bid (IFB-109746) for construction work with an estimated budget range noted by the aggregator; bidders are instructed to access the buyer-managed posting for full documents and submission instructions. The opportunity was posted starting 2025-12-18 and closes on 2026-01-28 (thus it is open as of 2025-12-20) and is not a grant program.
AvailableWork includes water line replacement. See outside link.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Work includes water line replacement. See outside link.
AvailableWork includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
AvailableThe purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
The purpose of this phased project is to replace valves, air vacuum valves, combination air release/air vacuum valves, and all connected fittings in twenty-seven (27) existing concrete vaults along a raw water transmission line. The project also includes installing a blow off on the raw water transmission line.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis