Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of 12" water main and water treatment plant piping that also includes 1 EA connect to existing 8" PVC water plant line with tapping sleeve and valve; 160 LF 8" fill line to elevated tank and connect to flange; 250 LF 12" effluent line HDPE (SDR 11); 290 LF 12" backwash line (ductile iron); 3 EA 12" gate valve and box; 1 EA connect to existing 10" water main with tapping sleeve and valve; 1 EA fire hydrant; 540 LF erosion control. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Construct distribution underground conduit system and related substructure improvements.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construct distribution underground conduit system and related substructure improvements.
AvailableWork includes 24,000 SY partial depth pavement repair; 650 SY full depth pavement repair; 100 SY pavement subgrade repair; 2,500 CY embankment repair; 6,850 SF abutment and spillway concrete patching; 350 SF service bridge piers, deck topside, deck fascia,sidewalks and curbs concrete patching; 880 SF concrete crack repair.
Posted Date
Oct 31, 2025
Due Date
Dec 17, 2025
Release: Oct 31, 2025
Close: Dec 17, 2025
Work includes 24,000 SY partial depth pavement repair; 650 SY full depth pavement repair; 100 SY pavement subgrade repair; 2,500 CY embankment repair; 6,850 SF abutment and spillway concrete patching; 350 SF service bridge piers, deck topside, deck fascia,sidewalks and curbs concrete patching; 880 SF concrete crack repair.
AvailableReplace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis