Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Parsons is seeking bids for the rehabilitation of 6000 ft of 8" sewer main using pipe bursting, replacement of 45 sewer service lines, 24 manhole frames and lids, and 200 vertical feet of manhole lining. The project is funded by the Treasury, Coronavirus State and Local Recovery Fund grant, with federal requirements applicable.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Posted Date
Dec 6, 2025
Due Date
Dec 22, 2025
Release: Dec 6, 2025
Close: Dec 22, 2025
Premium
Access the largest public sector contact database
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Posted Date
Dec 6, 2025
Due Date
Dec 22, 2025
Release: Dec 6, 2025
Close: Dec 22, 2025
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
AvailableSelect dig-up repairs and pipe replacement in four (4) manhole sections and related work. rehabilitation of sanitary sewer mains, including but not limited to the following: 1.Excavate and replace portions of sewer mains in 4 manhole sections. 2.Rehabilitation of sanitary sewer mains through installation of new SDR-35 PVC pipe with approved connections to the existing pipe or manhole. 3. Paving and yard restoration. construct the various units, including but not limited to clearing, all types of excavation, trenching, shoring, pumping, pipe embankment, laying and joining pipe, testing, backfilling, repairing leaks, tamping aggregate, planting, clean up and removing surplus materials.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Close: Jan 6, 2026
Select dig-up repairs and pipe replacement in four (4) manhole sections and related work. rehabilitation of sanitary sewer mains, including but not limited to the following: 1.Excavate and replace portions of sewer mains in 4 manhole sections. 2.Rehabilitation of sanitary sewer mains through installation of new SDR-35 PVC pipe with approved connections to the existing pipe or manhole. 3. Paving and yard restoration. construct the various units, including but not limited to clearing, all types of excavation, trenching, shoring, pumping, pipe embankment, laying and joining pipe, testing, backfilling, repairing leaks, tamping aggregate, planting, clean up and removing surplus materials.
AvailableHousing Major Rehab..
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Housing Major Rehab..
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis