Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Posted Date
Dec 6, 2025
Due Date
Dec 22, 2025
Release: Dec 6, 2025
Close: Dec 22, 2025
Work consist of 2,205 LF of cleaning & cctv inspection, 1,103 LF of sewer rehab (pipe burst) (8" to 8") (hdpe, dr 19), 1,102 LF of sewer rehab (pipe burst) (10" to 10") (hdpe, dr 19), 7 EA of re -connect sanitary sewer services, 38 EA of re -connect sanitary sewer services, temporary sewer bypass, 4 EA of remove and replace mh r&c (24") (sewer)(match existing), 5 EA of remove and replace mh r&c (32") (sewer)(match existing), 3 EA of remove end of line sanitary sewer cleanout (6"), 4 EA of sanitary sewer manhole (precast), 100 LF of install sanitary sewer (8") (pvc sdr -26). See attached file.
Available2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Available2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
AvailableWork consist of approx 250 FT 6" sanitary rehab with CIPP; 5,701 FT 8" sanitary rehab with CIPP; 640 FT 10" sanitary rehab with CIPP; 177 FT 20"/21" sanitary; 4,002 FT 24" sanitary rehab with CIPP; 20,027 FT heavy cleaning & televising to locate taps on sewers 24" diameter and smaller; 160 EA testing lateral connections at 8" to 10" pipe; 27,094 FT post cons tv inspection of rehabilitated sewers; 232 FT 8" sanitary sewer with type B backfill; connect to existing sanitary service lateral. See outside link for more.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work consist of approx 250 FT 6" sanitary rehab with CIPP; 5,701 FT 8" sanitary rehab with CIPP; 640 FT 10" sanitary rehab with CIPP; 177 FT 20"/21" sanitary; 4,002 FT 24" sanitary rehab with CIPP; 20,027 FT heavy cleaning & televising to locate taps on sewers 24" diameter and smaller; 160 EA testing lateral connections at 8" to 10" pipe; 27,094 FT post cons tv inspection of rehabilitated sewers; 232 FT 8" sanitary sewer with type B backfill; connect to existing sanitary service lateral. See outside link for more.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis