Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the replacement, rehabilitation and new installation of approx. 3,400 LF of 8" sanitary sewer pipes, within the public right-of-way and easement area. Pipe installation methods may include trenching or horizontal directional boring (HDD) and pipe-bursting. The project also includes manhole removal/ replacement, new manhole installation and safely removing and disposing of asbestos concrete pipes (ACP).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The Project consists of Furnishing materials and the replacement of approx. 130 LF 8" ductile iron sanitary sewer pipe in municipal roadway and associated restoration.
Posted Date
Nov 11, 2025
Due Date
Dec 12, 2025
Release: Nov 11, 2025
Close: Dec 12, 2025
The Project consists of Furnishing materials and the replacement of approx. 130 LF 8" ductile iron sanitary sewer pipe in municipal roadway and associated restoration.
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Available2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
AvailableMorgantown Utility Board solicits bids for construction of the Willow Springs Phase 1B sanitary sewer: ~1,131 ft of 8" gravity sewer, ~65 ft of 16" steel casing (open cut), seven standard manholes, one drop manhole, two doghouse manholes, and related appurtenances. Requirements include a nonrefundable $100 plan-holder fee to obtain bidding documents, two-envelope submission, a Bid Bond of at least 5% of bid, 100% Performance and Payment Bonds and insurance within 15 days of award, submission of a signed Drug-Free Workplace Affidavit in the first envelope, and a valid West Virginia General Engineering Contractor License to be eligible to bid.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Morgantown Utility Board solicits bids for construction of the Willow Springs Phase 1B sanitary sewer: ~1,131 ft of 8" gravity sewer, ~65 ft of 16" steel casing (open cut), seven standard manholes, one drop manhole, two doghouse manholes, and related appurtenances. Requirements include a nonrefundable $100 plan-holder fee to obtain bidding documents, two-envelope submission, a Bid Bond of at least 5% of bid, 100% Performance and Payment Bonds and insurance within 15 days of award, submission of a signed Drug-Free Workplace Affidavit in the first envelope, and a valid West Virginia General Engineering Contractor License to be eligible to bid.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.