Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bern Township
The Project consists of Furnishing materials and the replacement of approx. 130 LF 8" ductile iron sanitary sewer pipe in municipal roadway and associated restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bern Township Municipal Authority
Bern Township Municipal Authority (Berks County, PA) is soliciting bids to furnish materials and replace approximately 130 linear feet of 8-inch ductile iron sanitary sewer pipe on Stinson Drive in Bern Township. Work includes bypass pumping, temporary restoration, trench flexible pavement restoration, and installation of 4-inch perforated underdrain piping.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Bern Township Municipal Authority
Close: Dec 12, 2025
Bern Township Municipal Authority (Berks County, PA) is soliciting bids to furnish materials and replace approximately 130 linear feet of 8-inch ductile iron sanitary sewer pipe on Stinson Drive in Bern Township. Work includes bypass pumping, temporary restoration, trench flexible pavement restoration, and installation of 4-inch perforated underdrain piping.
AvailableMason, Town of
Work includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Mason, Town of
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
AvailableCity of Bridge City
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
Posted Date
Nov 16, 2025
Due Date
Dec 4, 2025
Release: Nov 16, 2025
City of Bridge City
Close: Dec 4, 2025
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
AvailableBorough of Millerstown
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Borough of Millerstown
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis