Summary
Work includes clearing and grubbing within right of way, removal and disposal of existing pavement 500.000 SY, removal of exist guardrail 112.500 LF, removal and disposal of existing bridge, unclassified excavation 9,891.000 CY, borrow excavation 62,874.000 CY, borrow pit set-up, geogrid reinforcement (uniaxial) 1,799.000 SY, temporary shoring system no.1 425.000 LF, temporary shoring system no.2 1,210.000 LF, fine grading 1,230.000 SY, flowable fill 50.000 CY, maintenance stone 100.000 Ton, liquid asphalt binder pg64-22 328.400 Ton, full depth asph pav patching 6" unif 100.000 SY, milling existing asphalt pavement (variable) 100.000 SY, asphalt base course - type b 4,711.000 Ton, asphalt intermediate course type c 931.000 Ton. See attached file.