Summary
Work includes 1 LS of clearing and grubbing; 2 ea of tree removed, 18" diameter; 273 CY of excavation; 78 CY of embankment; 1362 SY of subgrade compaction; 16 CY of topsoil furnished and placed; 6000 ea of erosion control; 278 CY of restoration; 260 CY of aggregate base; 127 GAL of tack coat; 53 CY of asphalt concrete surface course, type 1, (449), PG64-22; 71 CY of asphalt concrete intermediate course, type 2, (449); 93 SY of 6" non-reinforced concrete pavement, class QC MS; 11 FT of ground mounted support, no. 3 post; 2.5 SF of sign, flat sheet; 1 LS of pavement marking; 1 LS of maintaining traffic; 1 LS of construction layout stakes and surveying; 1 LS of mobilization; 1 LS of pre construction video.