City of Osceola

Summary

Work includes mobilization, construction safety plan and traffic control, remove papi system, remove reils, remove existing runway edge lights 34 EA, remove existing taxiway edge lights 20 EA, remove threshold lights 16 EA, remove existing handholes 7 EA, 1 way 2" schedule 40 PVC conduit, including trenching and backfill 10257 LF, 1 way 2" schedule 80 PVC conduit, directionally bored under existing concrete 121 LF, no. 8 awg, 5kv, l-824, type c cable, installed in trench, duct or conduit 12608 LF, no. 6 awg, solid, bare counterpoise wire, installed in trench, including ground rods and connectors 11954 LF, ground rods 24 EA, warning tape, l-854 ptg airport lighting controller 1 EA. See attached file.