Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of constructing streambank stabilization improvements, including earthwork, construction of reinforced concrete retaining wall, block retaining wall, drainage improvements, and site stabilization. An alternate rip-rap bag wall may be constructed in lieu of the block wall. Total retaining wall improvements: 4,157 VSF. Estimated excavation volume: 534 CY.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Nov 28, 2025
Close: Dec 17, 2025
Streambank stabilization.
AvailablePremium
Access the largest public sector contact database
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableConsultants to assist in developing a rent stabilization analysis and program design.
Posted Date
Dec 18, 2025
Due Date
Jan 9, 2026
Release: Dec 18, 2025
Close: Jan 9, 2026
Consultants to assist in developing a rent stabilization analysis and program design.
AvailableWork includes stabilization and rehabilitation of 205 n franklin street.
Posted Date
Nov 24, 2025
Due Date
Dec 15, 2025
Release: Nov 24, 2025
Close: Dec 15, 2025
Work includes stabilization and rehabilitation of 205 n franklin street.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis