Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope consists of both demolition scope and new modernization construction - (a) abate and legally dispose of hazardous materials in affected areas per hazardous material survey and abatement specifications. See part 2 for additional information. Scarify, remove, and legally dispose of portions of the top surface of the east parking lot, sections of asphalt hardscape, and portions of concrete hardscape, including concrete curb cuts, concrete gutters in the public way. Scarify, remove, and legally dispose of portions of the top surface of the east parking lot; etc, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
CPAC includes masonry, concrete, structural, electrical, mechanical, and plumbing work, as well as general facility and site improvements, utility reconnections, and pool equipment procurement and installation. OPHFC includes single ply roofing, masonry, concrete, structural, electrical, mechanical, and plumbing work, as well as general facility and site improvements, and utility connections.
Posted Date
Nov 13, 2025
Due Date
Jan 6, 2026
Release: Nov 13, 2025
Close: Jan 6, 2026
CPAC includes masonry, concrete, structural, electrical, mechanical, and plumbing work, as well as general facility and site improvements, utility reconnections, and pool equipment procurement and installation. OPHFC includes single ply roofing, masonry, concrete, structural, electrical, mechanical, and plumbing work, as well as general facility and site improvements, and utility connections.
Premium
Access the largest public sector contact database
Release: Nov 26, 2025
Close: Jan 8, 2026
Bank renovations - phase 2
AvailableThe National Institute of Standards and Technology (NIST) issued a two-phase design-build solicitation (Single Award Task Order Contract) to modernize and expand the Central Utility Plant (CUP) at its Gaithersburg, MD campus. The work includes renovation/modernization of existing buildings (e.g., Building 302 steam & chilled water plant, Building 305 cooling towers, Building 306 electrical substation), replacement of underground diesel fuel tanks/piping, program management and phased construction to maintain operations. The contract has a multi-year period of performance (base period beginning Aug 15, 2026 with options through Feb 14, 2037) and proposals are due Dec 30, 2025 at 1:00 p.m. EST.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
The National Institute of Standards and Technology (NIST) issued a two-phase design-build solicitation (Single Award Task Order Contract) to modernize and expand the Central Utility Plant (CUP) at its Gaithersburg, MD campus. The work includes renovation/modernization of existing buildings (e.g., Building 302 steam & chilled water plant, Building 305 cooling towers, Building 306 electrical substation), replacement of underground diesel fuel tanks/piping, program management and phased construction to maintain operations. The contract has a multi-year period of performance (base period beginning Aug 15, 2026 with options through Feb 14, 2037) and proposals are due Dec 30, 2025 at 1:00 p.m. EST.
AvailableDESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis