Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The National Institute of Standards and Technology (NIST) issued a two-phase design-build solicitation (Single Award Task Order Contract) to modernize and expand the Central Utility Plant (CUP) at its Gaithersburg, MD campus. The work includes renovation/modernization of existing buildings (e.g., Building 302 steam & chilled water plant, Building 305 cooling towers, Building 306 electrical substation), replacement of underground diesel fuel tanks/piping, program management and phased construction to maintain operations. The contract has a multi-year period of performance (base period beginning Aug 15, 2026 with options through Feb 14, 2037) and proposals are due Dec 30, 2025 at 1:00 p.m. EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
AvailableThis Request for Pre-Qualifications (RFPQ) is an invitation by the City of Lethbridge to prospective respondents. The purpose is to qualify for eligibility to provide Wastewater Treatment Plant Phase 1 Expansion – Engineering Design and Construction Services. These services are further described in Section A of the RFPQ Particulars (Appendix A).
Posted Date
Nov 24, 2025
Due Date
Dec 23, 2025
Release: Nov 24, 2025
Close: Dec 23, 2025
This Request for Pre-Qualifications (RFPQ) is an invitation by the City of Lethbridge to prospective respondents. The purpose is to qualify for eligibility to provide Wastewater Treatment Plant Phase 1 Expansion – Engineering Design and Construction Services. These services are further described in Section A of the RFPQ Particulars (Appendix A).
DESIGN-BUILD service for classroom expansion. To evaluate available spaces and provide the best design allowing the school to maximize space and uses. To design spaces that are in harmony with access, circulation, and appearance to the existing school. To make the most efficient use of the property and building areas available. To address all site, utility and school spaces that are impacted by the renovation or are deemed best to include in the process. To conclude with realistic conceptual plans and conceptual cost estimates to construct and build the identified school spaces.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
DESIGN-BUILD service for classroom expansion. To evaluate available spaces and provide the best design allowing the school to maximize space and uses. To design spaces that are in harmony with access, circulation, and appearance to the existing school. To make the most efficient use of the property and building areas available. To address all site, utility and school spaces that are impacted by the renovation or are deemed best to include in the process. To conclude with realistic conceptual plans and conceptual cost estimates to construct and build the identified school spaces.
The City of Fair Oaks Ranch is soliciting proposals for the Wastewater Treatment Plant Phase 1 Expansion project. Details and instructions are contained in the Request for Proposals and associated documents on the project page.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Fair Oaks Ranch is soliciting proposals for the Wastewater Treatment Plant Phase 1 Expansion project. Details and instructions are contained in the Request for Proposals and associated documents on the project page.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis