Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of fire training building. Sitework; earth moving; termite control; concrete paving joint sealants; cast in place concrete; concrete floor sealer; unit masonry; rough carpentry; metal-plate-connected wood trusses; finish carpentry; thermal and moisture protection; building insulation; flashing sheet metal; roof specialties; doors and windows; standard steel doors & frames; flush wood doors; corrosion resistant insulated rolling service doors; door hardware; non structural metal framing; acoustical ceiling tile; modular flooring; painting; signage; fire extinguishers, cabinets, and accessories; partition wall; metal building. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a live fire training building for the fire and rescue training program. Construction of linear three-story, four-conex box burn building per design drawings. Stairwell leading to 2nd story with vertical access from 2nd floor through 3rd floor roof access via hinged lockable hatch on roof. Exterior and interior steps will have steel cee-channel stringers and grated tread. Incorporate continuous ladder from 2nd floor through 3rd up to roof. All clean up and permitting.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Construction of a live fire training building for the fire and rescue training program. Construction of linear three-story, four-conex box burn building per design drawings. Stairwell leading to 2nd story with vertical access from 2nd floor through 3rd floor roof access via hinged lockable hatch on roof. Exterior and interior steps will have steel cee-channel stringers and grated tread. Incorporate continuous ladder from 2nd floor through 3rd up to roof. All clean up and permitting.
Premium
Access the largest public sector contact database
Work consists of general trades, mechanical, electrical, and plumbing & fire protection work for a new building.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work consists of general trades, mechanical, electrical, and plumbing & fire protection work for a new building.
AvailableThe School Board of Orange County, Virginia is conducting a PPEA procurement for a new Career Technology Education (CTE) Building at Orange County High School, with project documentation available on the Orange County School System capital projects page. Proposals are due December 23, 2025 at 7:00 PM and the opportunity is listed as active.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
The School Board of Orange County, Virginia is conducting a PPEA procurement for a new Career Technology Education (CTE) Building at Orange County High School, with project documentation available on the Orange County School System capital projects page. Proposals are due December 23, 2025 at 7:00 PM and the opportunity is listed as active.
AvailableProvide various building department training solutions.
Posted Date
Nov 29, 2024
Due Date
May 7, 2027
Release: Nov 29, 2024
Close: May 7, 2027
Provide various building department training solutions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis