25.62A General construction: This project involves a new concession area with covered seating, ADA men & women toilet rooms, a community room, offices, and a mechanical/janitor room. Sitework will entail site clearing, E&S controls, site grading, additional sidewalk areas, ADA curb ramp, and site restoration. In addition, extending new water, gas, sanitary and stormwater piping from the utility company’s main service lines shown on the drawings to within five feet from the building and to be connected to the same extended by the plumbing contractor from the building. The General Contractor will be responsible for General Construction, General Sitework, and project coordination of the HVAC, Plumbing, and Electrical prime contracts.
25.62B HVAC Construction: HVAC Contractor shall furnish and install a forced air heating system, toilet room exhausts, kitchen hoods, and associated controls. Each system shall be complete with controls, piping, ductwork and shall function per specifications. These systems shall also be complete with controls and all components necessary to function properly. Drawings refer to Mechanical Contractor, this is equivalent to HVAC Contractor. HVAC Contractor shall be responsible to coordinate their work with the other Prime Contractors. 25.62C Plumbing construction: Plumbing Contractor shall furnish and install a water and gas distribution system, plumbing fixtures, water heater, water and gas service entrances, downspouts, and grease trap. In addition, extending the new water, gas, and sanitary services and stormwater piping from the building to five feet from the building and to be connected to the same extended by the general contractor from the street or right-of-way. Plumbing Contractor shall be responsible to coordinate their work with the other Prime Contractors. 25.62D Electrical construction: Electrical Contractor shall furnish and install a new electric service, interior and exterior lighting, all power, and conduit and junction boxes for the owner provided security system. The electrical system shall include lighting and power for the facility and equipment. All security devices, terminations, and wiring will be referenced in the security drawings and provided by the owner’s security vendor. Electrical Contractor shall be responsible to coordinate their work with the other Prime Contractors. Obtaining the Bidding Documents.