Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes onsite lift station phase 1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
The work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
AvailablePremium
Access the largest public sector contact database
Project scope shall include the construction of 10-foot inner diameter cast-in-place duplex lift station with valve vault, two (2) 388 gallon per minute submersible pumps, one (1) odor control, one (1) frp building, all associated pipe, valves and fittings, electronical controls, and site work
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Project scope shall include the construction of 10-foot inner diameter cast-in-place duplex lift station with valve vault, two (2) 388 gallon per minute submersible pumps, one (1) odor control, one (1) frp building, all associated pipe, valves and fittings, electronical controls, and site work
AvailableWork includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
AvailableThe City of Mountain View is soliciting bids for Phase 2 improvements to the Miramonte Pump Station (Project 23-43). Work includes electrical and mechanical upgrades within the existing pump station and site improvements at the Miramonte Avenue facility to ensure reliable operation during normal and emergency conditions. Bid documents are provided via the Citys BidNet Direct portal, and submissions are due by the listed closing date.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
The City of Mountain View is soliciting bids for Phase 2 improvements to the Miramonte Pump Station (Project 23-43). Work includes electrical and mechanical upgrades within the existing pump station and site improvements at the Miramonte Avenue facility to ensure reliable operation during normal and emergency conditions. Bid documents are provided via the Citys BidNet Direct portal, and submissions are due by the listed closing date.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis