Removal of existing permeable pavers and replacement with concrete paving, concrete sidewalk, storm sewer infrastructure approx. 279 LF of 8" hdpe storm sewer, trenched; 37 LF of 10" hdpe storm sewer, trenched; storm water quality improvements, and related improvements. Description: 423 CY of topsoil, on-site; 632 SY of excavation, class 13; 2453 SY of subgrade preparation; 2453 SY of subbase, modified, 6 inches; 279 LF of storm sewer, trenched, HDPE, 8 inch; 37 LF of storm sewer, trenched, HDPE, 10 inch; 3 es of intake, nyloplast drain basin, 8"; 3 ea of intake, nyloplast drain basin, 12"; 6 ea of rain guardian foxhole structure; 2336 SY of pavement, PCC, 6 inch; 135 SY of removal of sidewalk; 133 SY of sidewalk, PCC, 4 inch; 33 SY of sidewalk, PCC, 6 inch; 56 sf of detectable warning; 4000 LF of crack and joint cleaning and filling, hot pour.
Available