Sunbelt Fresh Water Supply District
Project consists of modifications to on-site lift station, an influent structure with mechanical fine screen and manual bar screen, two aeration basins, two clarifiers, two chambered disinfection system, four digesters, a blower building with positive displacement blowers, electrical power distribution equipment and controls, emergency standby generator and controls, a chlorine building and feed components, and miscellaneous site work including clearing and grubbing, grading and drainage, paving, fencing, and demolition of existing facility.
bulk
zip
Release
Jul 11, 2024
Close
Sep 19, 2024