Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide two (2) 2026 Ford Transit 250 R3X cargo van or equivalent. See attached specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The County of Hawaii Department of Water Supply is seeking a replacement clutch assembly for a Seepex NS 70-24 pump, along with two additional spare clutch assembly kits. This is a sole-source procurement for these specific replacement parts. The solicitation is open from December 8, 2025, to December 15, 2025.
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
The County of Hawaii Department of Water Supply is seeking a replacement clutch assembly for a Seepex NS 70-24 pump, along with two additional spare clutch assembly kits. This is a sole-source procurement for these specific replacement parts. The solicitation is open from December 8, 2025, to December 15, 2025.
Premium
Access the largest public sector contact database
The work generally consists of removal and salvage of existing waterlines attached to bridge, install approximately 60 linear feet by jack and bore of 36” steel casing pipe with 20” CL 51 Ductile Iron pipe under Tuscaloosa Road, installation of 20” resilient seat gate valve, connections to existing waterlines, water lines isolation, concrete paving removal and replacement, gravel parking removal and replacement and approximately 550 linear feet of 24” (IPS) DR9 HDPE by Horizontal Directional Drill and all associated necessities to complete the project..
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
The work generally consists of removal and salvage of existing waterlines attached to bridge, install approximately 60 linear feet by jack and bore of 36” steel casing pipe with 20” CL 51 Ductile Iron pipe under Tuscaloosa Road, installation of 20” resilient seat gate valve, connections to existing waterlines, water lines isolation, concrete paving removal and replacement, gravel parking removal and replacement and approximately 550 linear feet of 24” (IPS) DR9 HDPE by Horizontal Directional Drill and all associated necessities to complete the project..
AvailableThe work generally consists of removal and salvage of existing waterlines attached to bridge, install approximately 60 linear feet by jack and bore of 36” steel casing pipe with 20” CL 51 Ductile Iron pipe under Tuscaloosa Road, installation of 20” resilient seat gate valve, connections to existing waterlines, water lines isolation, concrete paving removal and replacement, gravel parking removal and replacement and approximately 550 linear feet of 24” (IPS) DR9 HDPE by Horizontal Directional Drill and all associated necessities to complete the project..
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
The work generally consists of removal and salvage of existing waterlines attached to bridge, install approximately 60 linear feet by jack and bore of 36” steel casing pipe with 20” CL 51 Ductile Iron pipe under Tuscaloosa Road, installation of 20” resilient seat gate valve, connections to existing waterlines, water lines isolation, concrete paving removal and replacement, gravel parking removal and replacement and approximately 550 linear feet of 24” (IPS) DR9 HDPE by Horizontal Directional Drill and all associated necessities to complete the project..
AvailableProvide OEM replacement glass on owned vehicles on an as needed basis.
Posted Date
Sep 2, 2025
Due Date
Dec 18, 2025
Release: Sep 2, 2025
Close: Dec 18, 2025
Provide OEM replacement glass on owned vehicles on an as needed basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis