Summary
The work includes maintenance dredging of the noyo harbor channel and repair of the noyo harbor north jetty. The channel will be dredged to a depth of -10 feet, with 1- ft paid over-depth and 1-ft unpaid over-depth, and armor stones will be removed from the channel bottom and taken to a staging area near the North Jetty. he jetty repair work includes removal of existing stone from the channel-side slope, repair of structural voids beneath the main concrete structure, placement of new high-density stone to rebuild the jetty, and repair of the concrete walkway using repurposed stone. The jetty repair will address damage from wave action, including displacement of armor stones and undermining of the main concrete structure.