Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of 1 LS Phase 1 - Erosion Control Measures; 1 LS Phase 1 - Grading & Earthwork; 8,347 SF Phase 1 - P.C.C. Sidewalk; 5,679 SF Phase 1 - Parking Lot - Concrete Parking Lot; 348 LF Phase 1 - Parking Lot - Concrete Curb and Gutter; 2,400 SF Phase 1 - Loading Access Area - Concrete Drive; 6 CY Phase 1 - Loading Access Area - 6" Rip Rap (4' width); 367 LF Phase 1 - Loading Access Area - Conc. Curb & Gutter; 21,774 SF Phase 1 - Seeding; 1,500 LF Phase 1 - Lighting - Trenching and Backfill.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work includes grading & drainage improvements.
Posted Date
-
Due Date
Dec 23, 2025
Release: -
Close: Dec 23, 2025
Work includes grading & drainage improvements.
AvailableThe work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
The work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
AvailableProject involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Close: Jan 21, 2026
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Lake lansing water control structure and site improvements.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Lake lansing water control structure and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis