Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes substation breaker relocation, substation construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Nebraska Public Power District (NPPD) is soliciting bids (Request for Quote No. 26003) for the supply and delivery of substation control panels for the North Platte Substation. The contract requires delivery of all substation control panels to the York Operations Center with a delivery deadline of August 1, 2026. Bids were posted on 2026-01-08 and are due on 2026-01-30, and the opportunity is active as of 2026-01-09.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Nebraska Public Power District (NPPD) is soliciting bids (Request for Quote No. 26003) for the supply and delivery of substation control panels for the North Platte Substation. The contract requires delivery of all substation control panels to the York Operations Center with a delivery deadline of August 1, 2026. Bids were posted on 2026-01-08 and are due on 2026-01-30, and the opportunity is active as of 2026-01-09.
Disposal of substation equipment.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Disposal of substation equipment.
AvailableConstruction of replacement and installation of substation transformer and to construct a new oil containment transformer pad to place the existing transformer onto. Perform all necessary labor for the installation of transformer oil containment pad and installation and wiring of new transformer. This includes any modifications as may be necessary to bus work, steel, foundations, ground grid, cable raceway, and wiring.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Construction of replacement and installation of substation transformer and to construct a new oil containment transformer pad to place the existing transformer onto. Perform all necessary labor for the installation of transformer oil containment pad and installation and wiring of new transformer. This includes any modifications as may be necessary to bus work, steel, foundations, ground grid, cable raceway, and wiring.
AvailableWork includes site grading; transmission line tap (tubular steel); h-frame substation deadend and static mast (tubular steel) installation; concrete foundation, fence, ground grid, and conduit installation; removal of existing substation east fence; steel structure erection; bus conductor and equipment installation; and distribution underground equipment installation. Energized work is not anticipated.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work includes site grading; transmission line tap (tubular steel); h-frame substation deadend and static mast (tubular steel) installation; concrete foundation, fence, ground grid, and conduit installation; removal of existing substation east fence; steel structure erection; bus conductor and equipment installation; and distribution underground equipment installation. Energized work is not anticipated.