Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes adding storm sewer and paving two gravel road segments.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide engineering and technical services for the carlyss drive north extension project.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Provide engineering and technical services for the carlyss drive north extension project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves asphalt mill and overlay. Project also involves any necessary patching and crack sealing of existing pavement, as well as clearing and grubbing of existing vegetation within the right-of-way. Approx 130 ton Clearing and grubbing acre 4.0 granular shoulders, type b; 200 SY patches, full-depth repair; 30 ea patches by count (repair); 9961 SY pavement scarification; 865 ton hot mix asphalt standard traffic, base course, 1/2 in. Mix; etc.
Posted Date
Jan 10, 2026
Due Date
Jan 27, 2026
Release: Jan 10, 2026
Close: Jan 27, 2026
Project involves asphalt mill and overlay. Project also involves any necessary patching and crack sealing of existing pavement, as well as clearing and grubbing of existing vegetation within the right-of-way. Approx 130 ton Clearing and grubbing acre 4.0 granular shoulders, type b; 200 SY patches, full-depth repair; 30 ea patches by count (repair); 9961 SY pavement scarification; 865 ton hot mix asphalt standard traffic, base course, 1/2 in. Mix; etc.
AvailableProcurement of re-roofing services for a 13,200+/- SF building at 954 North Main Street, including removal of old roof and installation of new standing seam metal and TPO roof systems, gutters, and downspouts.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Procurement of re-roofing services for a 13,200+/- SF building at 954 North Main Street, including removal of old roof and installation of new standing seam metal and TPO roof systems, gutters, and downspouts.
AvailableFurnishing all labor and material for the full-depth repair and/or milling and overlay of several City streets to include: cold plan- ning (milling); bituminous concrete leveling mix; bituminous concrete binder mix; bitu- minous concrete surface mix; full depth re- moval and replacement of base and pavement; mineral aggregate base and/or bituminous concrete base; flowable fill and/or CTB base for bridging settlement areas over sewer lines; saw cutting pave- ment; sanitary sewer manhole adjust- ments; pavement markings; temporary traffic control; and any incidentals required to complete construction.
Posted Date
Nov 1, 2025
Due Date
Feb 17, 2026
Release: Nov 1, 2025
Close: Feb 17, 2026
Furnishing all labor and material for the full-depth repair and/or milling and overlay of several City streets to include: cold plan- ning (milling); bituminous concrete leveling mix; bituminous concrete binder mix; bitu- minous concrete surface mix; full depth re- moval and replacement of base and pavement; mineral aggregate base and/or bituminous concrete base; flowable fill and/or CTB base for bridging settlement areas over sewer lines; saw cutting pave- ment; sanitary sewer manhole adjust- ments; pavement markings; temporary traffic control; and any incidentals required to complete construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →