Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes installation of approx 730 LF of 8" PVC C900 water main; 360 LF of 1" copper pipe residential water service line, curb shut-off valves, two replacement fire hydrants with associated valves and piping, temporary hot mix asphalt (HMA) roadway surface, and other associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Aug 19, 2025
Close: Feb 18, 2026
Provide park phase 1 site improvement.
AvailableImprovement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Improvement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
The City of Fort Collins is seeking proposals from qualified Contractors for Construction Manager / General Contractor (CM/GC) services on behalf of the Fort Collins One Water Utility related to the design and construction of the College Avenue Water System Improvement Project. The project focuses on the replacement of an existing 4" water main along the eastern portion of College Avenue from Mulberry Street to Laporte Avenue. Requested services include Construction Manager tasks during the preconstruction phase and General Contractor tasks during construction.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
The City of Fort Collins is seeking proposals from qualified Contractors for Construction Manager / General Contractor (CM/GC) services on behalf of the Fort Collins One Water Utility related to the design and construction of the College Avenue Water System Improvement Project. The project focuses on the replacement of an existing 4" water main along the eastern portion of College Avenue from Mulberry Street to Laporte Avenue. Requested services include Construction Manager tasks during the preconstruction phase and General Contractor tasks during construction.
Provide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Provide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis