Summary
The project includes construction of a of a 1.75 million gallon pre-stressed concrete water storage tank and associated appurtenances including dome access stairs, railing and trihalomethane removal system; yard piping and valving necessary to tie the new tank into the existing water main; new valve vault; site improvements including a new access road and modifications to the existing access road, new drainage and stormwater management systems, new fencing and site lighting; a new electrical service to the site and other electrical and communications work to support the new tank and equipment. The project includes subsequent demolition of the existing 3. 3 million gallon welded steel water storage tank and associated appurtenances, including dome access stairs, below grade pipe chamber; abandonment of buried infrastructure including water main piping, drain piping and drainage structure, electrical conduit, and valve vault; demolition of above grade electrical enclosures, control panels, other above grade infrastructure; hazardous materials abatement and disposal, and excavation and disposal of contaminated soils.