Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Non-Compliant Insulation Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableCaltrans is soliciting bids to remove and legally dispose of existing roofing insulation and install approximately 2,300 square feet of fiberglass batt insulation at a facility in Orange County. The work includes installing R-30 batt insulation between roof joists and performing the work in accordance with manufacturer instructions and state requirements. A non‑mandatory pre‑bid is listed with no specific date/time shown on the public page, and bids are due on January 27, 2026 at 2:00 PM PST.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Caltrans is soliciting bids to remove and legally dispose of existing roofing insulation and install approximately 2,300 square feet of fiberglass batt insulation at a facility in Orange County. The work includes installing R-30 batt insulation between roof joists and performing the work in accordance with manufacturer instructions and state requirements. A non‑mandatory pre‑bid is listed with no specific date/time shown on the public page, and bids are due on January 27, 2026 at 2:00 PM PST.
AvailableProvide SMR CROMERR Compliant IPP Software and Support Services.
Posted Date
Oct 30, 2025
Due Date
Jan 16, 2026
Release: Oct 30, 2025
Close: Jan 16, 2026
Provide SMR CROMERR Compliant IPP Software and Support Services.
AvailableWork includes replacement of a substandard manufactured home with a new, ada compliant, energy star certified manufactured home. See outside link.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
Work includes replacement of a substandard manufactured home with a new, ada compliant, energy star certified manufactured home. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →