Summary
Performing an intra-building structured cabling installation. The planning, design, and end-to-end installation of a Cat6A copper cabling infrastructure supporting a local area network (LAN) and wireless access point expansion. Key components include: Pulling and routing new Cat6A plenum-rated cables to designated termination points. Terminating cables using T568B standards into patch panels or field-terminable plugs (MPTL). Conducting Level IIIe/IV (or higher) Permanent Link Testing and providing full certification reports. Providing all labor, tools, ladders, and equipment necessary to complete the project within a 90-day period of performance.