Project includes remodeling three existing restrooms to improve accessibility and functionality. Work includes, but is not limited to: demolition of existing fixtures, wall materials, and flooring; removal of select walls and flooring to expand space in the building entrance area; construction of two fully ada-accessible restrooms; installation of new plumbing fixtures and electrical components; installation of new flooring in restrooms and adjacent entrance area; addition of soundproofing within walls; removing and closing one doorway and refinishing a wall
Project includes remodeling three existing restrooms to improve accessibility and functionality. Work includes, but is not limited to: demolition of existing fixtures, wall materials, and flooring; removal of select walls and flooring to expand space in the building entrance area; construction of two fully ada-accessible restrooms; installation of new plumbing fixtures and electrical components; installation of new flooring in restrooms and adjacent entrance area; addition of soundproofing within walls; removing and closing one doorway and refinishing a wall
California State University, Bakersfield is soliciting sealed bids for demolition, renovation, and finishing of the men’s, women’s, and staff restrooms (approx. 822 sq ft) in the Paul Romberg Nursing Center, including adjacent locker and storage rooms and a fire-alarm system upgrade. The project requires compliance with 2022 Title 24, prevailing-wage requirements, and a minimum 3% DVBE participation. This is a design-bid-build minor public works project with a 120-day construction schedule from Notice to Proceed.
California State University, Bakersfield is soliciting sealed bids for demolition, renovation, and finishing of the men’s, women’s, and staff restrooms (approx. 822 sq ft) in the Paul Romberg Nursing Center, including adjacent locker and storage rooms and a fire-alarm system upgrade. The project requires compliance with 2022 Title 24, prevailing-wage requirements, and a minimum 3% DVBE participation. This is a design-bid-build minor public works project with a 120-day construction schedule from Notice to Proceed.
Park concession and restroom remodel - Demolition and Disposal; Concrete, Masonry, and Openings; Flooring; Plumbing Fixtures in Restrooms; Toilet Partitions; Interior and Exterior Components; Cabinets and Countertops; Roofing Components and Cupola; Electrical Work; Painting and Finishes.
Park concession and restroom remodel - Demolition and Disposal; Concrete, Masonry, and Openings; Flooring; Plumbing Fixtures in Restrooms; Toilet Partitions; Interior and Exterior Components; Cabinets and Countertops; Roofing Components and Cupola; Electrical Work; Painting and Finishes.